A Scheduling program is in the calendar but not on air
- The program is disabled. The calendar shows the title struck through. Turn off Program Disabled and click Update program.
- An override is active. The program shows Suspended by override and the day carries a ! in the header. Pick the override in the calendar and add the program there. See Scheduling overrides.
- The program was changed inside an override. Changes in an override never reach the main scheduling. Pick Main scheduling in the calendar and check the program there.
A recurring program airs on the wrong days
Open the program and read the line under Recurring Options. It spells out the rule, like “every week on Monday, Tuesday”. Fix the selected days, the Every… interval or the Offset… of a monthly program, then click Update program.I can’t delete one day of a recurring program
A recurring program is one program, so Delete program removes every occurrence. Create a scheduling override for that day and delete the copy of the program in the override.The Create program button is disabled
- The title is empty. Enter a Program title.
- The program is shorter than 60 seconds. The panel says “Programs must have a duration of more than 60 seconds.” Move End later.
- The button says Limit reached. Your licence limit for programs is reached. Delete or disable a program you no longer use, or contact us to raise the limit.
A presenter is missing from the Link Presenter(s) list
The station filter in the dialog shows only the presenters of your station. Turn off the filter to see every presenter of your broadcaster. A presenter that doesn’t exist yet is added in Scheduling → Presenters.Connect audio trigger shows Please configure Audio Manager first
Your studio has no audio triggers yet. Set up the Audio Manager first, then link the presenter to the trigger of their mic.The override can’t be saved
- The dialog says the period overlaps another override. Two overrides can’t share a day. Pick other dates, or delete the override that is in the way.
- End must be after start. Pick an end date after the start date.